Home > Achievements

The specialists at Ecce Terra like to face challenges. Whether your project is simple or complex, standard in nature or carried out under special conditions, we are ready for picking up the challenge. See for youself by viewing some of our achievements.

 
 

CONSTRUCTION SURVEYS

   

Stake out of numerous kilometres of roads for Construction de l’Amiante, Thetford Mines Thetford-Mines

Thetford Mines

Surveying for the operations of excavation and construction of the new Thetford Mines water purification factory

Thetford Mines

Calculation for the modelisation and the construction survey of a 5 km raod in Sainte-Justine for the Quebec Ministry of Transportation

Sainte-justine

Construction survey of a bridge located in Saint-Just-de-Bretenière

Saint-Just-de-Bretenière

Saint-Robert-Bellarmin Wind Farm, topography and construction survey of a 50 km roads and 40 wind mills

Saint-Robert-Bellarmin

Stake out of a waste water filtration plant, and inflatable dam, Saint-Georges de Beauce

Saint-Georges de Beauce

Widening of the Hydro-Quebec distribution station, Lac-Mégantic

Lac-Mégantic

Stake out of a 5 kilometre road, Sainte-Aurélie

Sainte-Aurélie

Stake out of infrastructure for a campground, including buildings, and the construction of a 1.3 kilometre access road in Parc Mégantic, Lac-Mégantic

Lac-Mégantic

Stake out of infrastructure, access roads, pillars and bridge on the Chaudière River in Sainte-Marie, Beauce

Sainte-Marie

Construction survey for the Caisse populaire Desjardins of Thetford Mines

Thetford Mines
     

DATA MANAGEMENT

   

Mapping of the Chaudière River flood zone for the MRCs located along the river (2, 20 and 100-year recurrence)

Beauce

Cadastral reform orthophotoplans in the Sorel and Saint-Jean-sur-Richelieu regions

Sorel and Saint-Jean-sur-Richelieu

Locating towers using photogrammetric data acquisition and determining easement corridors for Hydro-Quebec

Determing the 2-year flood recurrence zone and the high water level line of the Saint-Lawrence River and the erosion of the battures around Île-aux-Oies and Île-aux-Grues

Île-aux-Oies and Île-aux-Grues
     

LAND SURVEYING

   

Establishing an easement corridor of close to one hundred kilometres for Gaz Métro pipelines

Determining the ownership of a part of the riverbed on Saint-François River for a property valuation for the TransÉnergie division of Hydro-Quebec

Saint-François River

Surveying work required for establishing widmill parks for Saint-Laurent Energies in Saint-Robert-Bellarmin and Massif du Sud

Saint-Robert-Bellarmin and Massif du Sud
     

HYDROGRAPHY

   

Bathymetric project on the Rupert River for Hydro-Quebec

Rupert River

Installation of tide gauges and data collection over a 3-year period, maritime infrastructure in Nunavut (7 villages) for the Ministry of Transport

Nunavut

Bathymetric survey at quay 103 at the Port of Montreal for the engineering firm Dessau

Montreal